I write to confirm that Curraghroe Construction have provided labour, manly plant operators, pipe layers and shuttering joiners to assist in the works to install services infrastructure to the new Heslington Campus at York university
Works took place between August 2011 and June 2012 and consisted of the installation of 800m of new foul sewer and manholes with depths in excess of 4m in running sand including dewatering. In addition to this over 2500m m of HV, LV and comms ducts plus associated draw pits constructed in reinforced concrete were installed.
Finishing off with concrete paving, flagging to a high standard. Approx contract value was £1.8m